Preparing to Break Ground on Eskridge

 

The home on Eskridge Terrace, previously owned by a second generation hoarder, has been cleaned out, cleared of mold and asbestos, and gutted down to a solid wood structure.

Here is what the house looked like before:

 

Photo Nov 12, 11 41 34 AM

 

With the trees cut and the house stripped down to the studs, we can see the lot’s potential!

 

 

A construction fence is being put up within the next couple of days, and we will be completely demoing the structure to start from scratch.

Our most grandiose current project is coming along, be sure to check back for updates!

 

Framing started on Eskridge


Read more

Stone Hedge Finishing Touches, Tile, Cabinets


Read more

Alexandria Dry Wall Complete


Read more