Eskridge Demo Complete!

 

We have teared down the existing structure using an excavator. She went down without a fight…it only took about 5 minutes for the house convert to a pile of rubble. The entire demolition process, however, took the whole day.

 

IMG_0663

 

IMG_0664

 

The majority of the day was spent cleaning up the debris and loading it into the dump truck. Some of the materials were able to be salvaged so they can be reused or recycled.

 

IMG_0671

 

IMG_0667

 

As a result, the lot looks HUGE(or at least much bigger than it did before)!  Though we are saying goodbye to the old home we are excited for a new beginning — up next, we start pouring concrete.  Stay tuned!

 